Waterfront Toronto, the public advocate and steward of waterfront revitalization, says in its first corporate social responsibility and sustainability report that, on average, 86% of its construction, demolition and excavation waste has been diverted from landfill from 2010 through 2012.
For construction-related waste, Waterfront Toronto requires that all construction and demolition projects divert a minimum of 50% of waste, with a target of 75%, according to the sustainability report. This requirement is included in the Environmental Management Plan and is a credit achieved as part of its LEED for Neighbourhood Development Gold certification.
"With landfill space at a premium, waste management is a critical issue for the City of Toronto and Waterfront Toronto has addressed this in several ways," the report states:
The city of Toronto's division of solid waste management has a goal of 70% diversion of waste from landfill by 2034. The city currently manages over 1 million tonnes of waste annually, and recycles or composts 47% of all waste generated.