Based on public comment and additional data, the US Environmental Protection Agency finalized a set of adjustments to Clean Air Act standards for boilers and certain solid waste incinerators.
The final adjustments to the March 2011 standards affect only the largest and highest emitting boiler units: major source and affected area source boilers. Owners of these boilers will have three years to comply and can be granted a fourth year if needed to install controls. The EPA also has tools to address, on a case- by-case basis, additional concerns arising for individual sources.
Major source boilers are located at large sources of air pollutants, including refineries, chemical plants, and other industrial facilities. Boilers located at small sources of air toxics emissions are known as area source boilers. These are located at universities, hospitals, hotels and commercial buildings.
A commercial and industrial solid waste incinerator (CISWI) unit is a device that is used to burn solid waste at a commercial or industrial facility. This includes units designed to discard solid waste; energy recovery units designed to recover heat that combust solid waste; and waste burning kilns that combust solid waste in the manufacturing of a product. There are 106 CISWI units covered by these standards
The EPA's new adjustments are intended to:
The adjustments were made in response to multiple requests for reconsideration of certain aspects of the 2011 rules and recognize the diverse and complex range of boiler uses and fuels. The latest and best information provided during the rule development and reconsideration processes resulted in the EPA:
In a separate but related action, EPA revised the non-hazardous secondary materials rule (NHSM). This rule defines which materials are, or are not, “solid waste” when burned in combustion units. The NHSM rule helps determine which standards, either boiler or CISWI, a unit that burns these materials will be required to meet.