Ford To Install Third Wind Turbine At UK Plant

by | Apr 4, 2008

This article is included in these additional categories:

ford_wind_uk.jpgFord is adding a third wind turbine at its Dagenham Diesel Centre in the UK to power the installation of a new 1.4/1.6-litre Duratorq TDCi engine line, according to Easier Motoring.

The existing two Ecotricity wind turbines at Ford Dagenham have avoided over 6,500 tonnes of CO2 emissions a year since 2004. A third Ecotricity turbine, subject to planning approval, would have the capacity to produce 1.8 megawatts.

The plant makes engines for the Ford Focus ECOnetic.

Additional articles you will be interested in.

Stay Informed

Get E+E Leader Articles delivered via Newsletter right to your inbox!

This field is for validation purposes and should be left unchanged.
Share This