Chrysler Tests Wind Potential At Chelsea Proving Grounds

by | Mar 24, 2008

This article is included in these additional categories:

chelsea_proving_grounds.jpgChrysler is erecting a 26-story meteorological tower at its Chelsea Proving Grounds to determine if high-level winds are suitable for generating electricity. Energy experts from Washtenaw County, the University of Michigan and the consulting firm, North Coast Wind and Power, will monitor the site.

If the study yields favorable results, Chrysler says it will investigate the potential to construct turbines on the property.

A study of Washtenaw County wind energy potential, along with other related documents, is available here.

Additional articles you will be interested in.

Stay Informed

Get E+E Leader Articles delivered via Newsletter right to your inbox!

This field is for validation purposes and should be left unchanged.
Share This